- Joined
- Feb 21, 2013
- Messages
- 2,132
- Reaction score
- 11
- Points
- 38
The site thats been done hundreds of times before by people but this was my first time in, as well as the largest site i've done so far.
So with a 2AM set off to get across London to a waiting car and then off to pick up two others and head to the site, arriving around sunrise we where all eager to get in, getting was easier then expected.
First point of call of the day, the Airhouse.. what i can i saw but wow it was impressive.
at this point we heard a lot! of vehicles pulling up around the Airhouse, at first we thought ok 4x4 in his secca.. more and more came, builders.. or rather Demo works as Silent told me in a later convo, scared the crap out of us at first xD.
Anyways, moving out other to cell three and away from the workers, we could not for the life of us find the way into the test chamber [ later discovering about an hour later that the ladder was laying on the base of cell three.. more on that later.
Ok so not noticing the ladder yet we made our way along to cell 3 west to see if there was another underground route or anything connecting to cell 3, after bending over up-teen pipes we stopped for a while to admire the view
after our quick break and going under the pipes again, we arrive back at cell three, someone had made a phone call to shed some light on the access problem.. ahh ladder.. wait i see no ladder... points... oh... that ladder .. which was on the floor of cell three, what happened next was a tad crazy, a fellow explorer i was with slides down some wrapped together cable all the way to the base of cell three and re-places the ladder back up... all of us standing there going.. did that just happen lol, anyway final pics of the splore before we called it a day
hehe ^^... Santa forgot something d=
and messed up on the focus but :
Overall 2/3 things seen and it was a fun splore and im glad i've finally done it !
Rest at : http://flickr.com/gp/urdex/dRf40m
So with a 2AM set off to get across London to a waiting car and then off to pick up two others and head to the site, arriving around sunrise we where all eager to get in, getting was easier then expected.
First point of call of the day, the Airhouse.. what i can i saw but wow it was impressive.
at this point we heard a lot! of vehicles pulling up around the Airhouse, at first we thought ok 4x4 in his secca.. more and more came, builders.. or rather Demo works as Silent told me in a later convo, scared the crap out of us at first xD.
Anyways, moving out other to cell three and away from the workers, we could not for the life of us find the way into the test chamber [ later discovering about an hour later that the ladder was laying on the base of cell three.. more on that later.
Ok so not noticing the ladder yet we made our way along to cell 3 west to see if there was another underground route or anything connecting to cell 3, after bending over up-teen pipes we stopped for a while to admire the view
after our quick break and going under the pipes again, we arrive back at cell three, someone had made a phone call to shed some light on the access problem.. ahh ladder.. wait i see no ladder... points... oh... that ladder .. which was on the floor of cell three, what happened next was a tad crazy, a fellow explorer i was with slides down some wrapped together cable all the way to the base of cell three and re-places the ladder back up... all of us standing there going.. did that just happen lol, anyway final pics of the splore before we called it a day
hehe ^^... Santa forgot something d=
and messed up on the focus but :
Overall 2/3 things seen and it was a fun splore and im glad i've finally done it !
Rest at : http://flickr.com/gp/urdex/dRf40m