- Joined
- Mar 14, 2013
- Messages
- 424
- Reaction score
- 2
- Points
- 18
Evening all,
As promised, the second part of the report and the main Tone Mill.
First report here http://www.oblivionstate.com/forum/showthread.php/6563-Tone-Mills-Dyeworks-Part-1-2013
Still pouring it down, still only 10am and muddy everywhere, we left Martyn sleeping in my car (as he came to mine straight off a night shift) and made our way over to Tone.
Bit of a climb involved on this one but we managed to get in and made our way to the only floor worth doing. Loved this area and the machinery.
On with the photos.
Thanks for looking in.
As promised, the second part of the report and the main Tone Mill.
First report here http://www.oblivionstate.com/forum/showthread.php/6563-Tone-Mills-Dyeworks-Part-1-2013
Still pouring it down, still only 10am and muddy everywhere, we left Martyn sleeping in my car (as he came to mine straight off a night shift) and made our way over to Tone.
Bit of a climb involved on this one but we managed to get in and made our way to the only floor worth doing. Loved this area and the machinery.
On with the photos.
Thanks for looking in.